SamplePhase 3
This is a sample badge page. The building and every figure on it are illustrative. ESG Ready badges are issued from Phase 3.
ESG Ready, verified by ThinkOmni
Maple Leaf Properties, 120 King St W, Toronto
This badge confirms that ThinkOmni checked a 12-month Scope 1 and 2 baseline for this building against its source documents, that the Ontario EWRB assessment for 2025 had no missing items, and that a reduction target is set.
Baseline period
2025
Jan to Dec, calendar
Scope 1 and 2
174.3tCO₂e
Location-based, Canada NIR 2026
Documents sampled
10%
4 of 36 bills checked against readings
What this badge does not say
It is not third-party verification, not a statement of regulatory compliance, and not a performance rating. It does not claim equivalence with ISO 14064, B Corp or any assurance standard.
Sample only, no PDF. Verify this page: thinkomni.ca/badge/MLP-120KING-2025