Skip to content
Built in Canada. Your data stays here.

Making ESG compliance simple, affordable and export-ready

You have a July 1 deadline and a folder of bills. We turn them into your EWRB filing and tell you what is still missing.

Free for one building, no card. Starter is CAD 100 a month when you need the report.

Mid-rise commercial office building in Ontario on a clear morning
Start here

If your building is 50,000 sq ft or more, July 1 is your date

Every year Ontario asks buildings that size to report their energy and water use through ENERGY STAR Portfolio Manager. Toronto wants a copy too. Pass 100,000 sq ft and someone has to verify your numbers, the first year and every fifth year after. We built ThinkOmni for that filing first, because it is the one that actually arrives.

Ontario EWRB, O. Reg. 506/18

Due 2026-07-01 for the 2025 calendar year. We build the upload file and the PDF summary. You press submit.

Toronto energy benchmarking

The same numbers on a second form, since 2024. We already hold the one extra field they ask for.

Third-party verification

We tell you whether this is a verification year and introduce you to a verifier. We do not do the verifying, and we will not pretend to.

How it works

Four steps. Twelve bills in, one filing out.
  1. 1. Upload bills

    PDFs, photos, CSV or Green Button. You check each field before it counts.

  2. 2. See your dashboard

    Energy, water, Scope 1 and 2, with a coverage strip for missing months.

  3. 3. Fix the gaps

    Met, partial, missing, not applicable. Each gap tells you what to do next.

  4. 4. File the report

    EWRB Data Pack as XLSX and PDF. Every version kept.

Ontario EWRB 202512 / 18
  • MetNatural gas, 12 months
    12 of 12 from bills
  • MissingElectricity, Aug and Sep
    Upload 2 bills
  • PartialGross floor area verified
    Needs BOMA measurement
  • Not applicableThird-party verification
    Not due until 2029
The checklist

Know what is missing, in words you would use

Met. Partial. Missing. Not applicable. That is the whole vocabulary. Each gap tells you which months, which meter, and what to do about it. Hand it to a colleague with a due date and we will remind you both at 90, 30, 7 and 1 days before the deadline.

See the product
After buildings

Selling into the EU? That is next.

When a European customer asks a company your size for ESG data, the rules now cap the request at the VSME standard. We are building a supplier pack that answers it from the numbers you already confirmed, and a tool that drafts replies to buyer questionnaires. Canada's own CSDS standards are voluntary, and we treat them that way. CBAM only matters if you make cement, steel, aluminium, fertilisers or hydrogen for an EU importer.

VSME supplier pack

The basic module: energy, Scope 1 and 2, water, waste, workforce. Coming once the EWRB flow is solid.

Phase 2

Buyer questionnaire responder

Upload the questionnaire. We match each question to your data and draft an answer that cites its source.

Phase 2

CBAM embedded emissions sheet

For Canadian producers of cement, steel, aluminium, fertilisers or hydrogen with an EU importer.

Phase 2, pilot-dependent

What we will not do

We will not file for you, verify your numbers, log in to your utility account, or let an AI decide whether you pass. We make the filing, show you where every number came from, and are honest about what still needs a person.

Files, readings and reports stay in the Canada region
AI extraction runs in ca-central-1; you confirm every field
Rules are deterministic and versioned; AI writes only the explanation
Every report version is immutable and traceable to its inputs

Plans in CAD

Start free. Pay when you need the report, not before.

Free

One building, one dashboard, no card.

$0

Starter

Up to 3 facilities, reports and alerts.

$100 / month

Growth

Up to 15 facilities, 1,000 extractions, VSME pack, grants finder, benchmarks, one advisor hour a month.

$300 / month
All plans
A property manager's desk with a printed utility bill and a laptop

Pilot program

We are working with a handful of Ontario building operators on the 2025 reporting year. Pilots get the Growth features free for the pilot period and a real person at ThinkOmni who goes through their first extractions with them. If that sounds like you, write to us.

Questions

Do you file for me?

Not yet. We make the Portfolio Manager upload file and the PDF; you submit through the Ontario portal. Submitting for you is on the roadmap.

Is my data in Canada?

Yes. Your files, readings and reports stay in the Canada region, and the AI that reads your bills runs in Canada too.

What if I only have paper bills?

Take a photo (PNG or JPG) or type the reading in. We cannot read handwriting yet.

Does this replace a consultant?

For the EWRB filing, for most buildings, yes. For verification, a tricky portfolio or an audit you will still want a person, and the partner list helps you find one.

ThinkOmni | ESG compliance made simple for Canadian SMEs and building operators